If the inspection which you need to log has been previously scheduled on RiskWise, a review of this existing inspection can be logged by clicking ‘Scheduled Inspections’.
The scheduled inspections list will then be shown which will list all outstanding inspections by inspection type, for the property you have selected. The inspection which you need to log the review for can be selected by clicking into the inspection row.
Once you have selected the inspection date to log the review for, a new screen will be show to log the inspection. This screen will have pre-populated the Inspection Type box as well as the Inspection Date but the user will need to specify the status of the inspection going forwards which can be done by selecting the ‘This Inspection Will Be’ box and choosing an available option from the list;
Continue on this Schedule – the inspection will remain at the previously specific frequency (e.g. weekly).
End after this Review – the inspection is no longer required and this is the final inspection of this type, on this schedule.
Be re-scheduled after this Review – the frequency may have changed and a new date can be selected.
Typically, the most commonly selected option would be ‘Continue on This Schedule’ as this ensures the inspection schedule that has previously been defined is maintained.
Comments
0 comments
Article is closed for comments.